Homepage
Menu
Inhalt
Kontakt
Suche
Sprachwahl
Wichtige Seiten
Portal
UniBE
Faculties
& Institutes
Faculty of Business, Economics
and Social Sciences
Department of
Business Administration
Group for Business Analytics, Operations Research and Quantitative Methods
Faculties & Institutes
Faculty of Business, Economics and Social Sciences
Department of Business Administration
Group for Business Analytics, Operations Research and Quantitative Methods
Group for Business Analytics, Operations Research and Quantitative Methods
Menu
öffnen
Menu
schliessen
Group for Business Analytics, Operations Research and Quantitative Methods
Research
Homepage
Studies
Research
Publications
Presentations
Research areas
Services
About us
Portal
UniBE
Search
Search
Search
Publications
Peer-reviewed journal articles
Peer-reviewed journal articles
Baumann, P.; Hochbaum, D.S. (2024):
An algorithm for clustering with confidence-based must-link and cannot-link constraints
. INFORMS Journal on Computing, available online
Bigler, T.; Gnägi, M.; Trautmann, N. (2024):
MIP-based solution approaches for multi-site resource-constrained project scheduling
. Annals of Operations Research 337, 627-647
Bigler, T. (2024):
A matheuristic for locating obnoxious facilities
. Computers and Operations Research 166, 106602
Klein, N.; Gnägi, M.; Trautmann, N. (2024):
Mixed-integer linear programming for project scheduling under various resource constraints
. European Journal of Operational Research 319(1), 79-88
Lendl, S; Pferschy, U.; Rener, E. (2024):
Rescheduling with new orders under bounded disruption.
INFORMS Journal on Computing, available online
Bigler, T.; Kammermann, M.; Baumann, P. (2023):
A matheuristic for a customer assignment problem in direct marketing
. European Journal of Operational Research 304(2), 689-708
Druetto, A.; Pastore, E.; Rener, E. (2023):
Parallel batching with multi-size jobs and incompatible job families.
TOP 31, 440-458
Rener, E.; Salassa, F.; T’kindt, V. (2022):
Single machine rescheduling for new orders with maximum lateness minimization
. Computers and Operations Research 144, 105815
Gnägi, M.; Baumann, P. (2021):
A matheuristic for large-scale capacitated clustering
. Computers and Operations Research 132, 105304
Gnägi, M.; Strub, O. (2020):
Tracking and outperforming large stock-market indices
. Omega 90, 101999
Baumann, P.; Hochbaum, D.S.; Yang, Y.T. (2019)
:
A comparative study of the leading machine learning techniques and two new optimization algorithms
. European Journal of Operational Research 272(3), 1041-1057
Gnägi, M.; Rihm, T.; Zimmermann, A.; Trautmann, N. (2019):
Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem
. Computers & Industrial Engineering 129, 346-353
Strub, O.; Brandinu, S.; Lerch, D.; Schaller, J.; Trautmann, N. (2019):
A three-phase approach to an enhanced index-tracking problem with real-life constraints
. The Engineering Economist 64(3), 227-253
Strub, O.; Trautmann, N. (2019):
A two-stage approach to the UCITS-constrained index-tracking problem
. Computers and Operations Research 103, 167-183
Rihm, T.; Baumann, P. (2018)
:
Staff assignment with lexicographically ordered acceptance levels
. Journal of Scheduling 21(2), 167-189
Rihm, T.; Trautmann, N.; Zimmermann, A. (2018):
MIP formulations for an application of project scheduling in human resource management
. Flexible Services and Manufacturing Journal 30(4), 609-639
Strub, O.; Baumann, P. (2018)
:
Optimal construction and rebalancing of index-tracking portfolios
. European Journal of Operational Research 264(1), 370-387
Zimmermann, A.; Trautmann, N. (2018)
:
A list-scheduling heuristic for the short-term planning of assessment centers
. Journal of Scheduling 21(2), 131-142
Rihm, T.; Trautmann, N. (2017):
A decomposition heuristic for short-term planning of assessment centres
. European Journal of Industrial Engineering 11(6), 725-751
Zimmermann, A. (2017):
A mixed-integer programming-based heuristic for project scheduling with work-content constraints
. European Journal of Industrial Engineering 11(6), 752-773
Baumann, P.; Trautmann, N. (2016):
A note on the selection of priority rules in software packages for project management
. Flexible Services and Manufacturing Journal 28, 694-702
Hochbaum, D.S.; Baumann, P. (2016)
:
Sparse computation for large-scale data mining
. IEEE Transactions on Big Data 2, 151-174
Baumann, P.; Forrer, S.; Trautmann, N. (2015):
Planning of a make-to-order production process in the printing industry
. Flexible Services and Manufacturing Journal 27, 534-560
Baumann, P.; Trautmann, N. (2014):
A hybrid method for large-scale short-term scheduling of make-and-pack production processes
. European Journal of Operational Research 236, 718-735
Brandinu, G.; Trautmann, N. (2014):
An mixed-integer linear planning approach to the optimization of event-bus schedules: a scheduling application in the tourism sector
. Journal of Scheduling 17, 621-629
Baumann, P.; Trautmann, N. (2013):
Portfolio-optimization models for small investors
. Mathematical Methods of Operations Research 77, 345-356
Baumann, P.; Trautmann, N. (2013):
A continuous-time MILP model for short-term scheduling of make-and-pack production processes
. International Journal of Production Research 51, 1707-1727
Fündeling, C.; Trautmann, N. (2010):
A priority-rule method for project scheduling with work-content constraints
. European Journal of Operational Research 203, 568-574
Trautmann, N.; Schwindt, C. (2009):
A cyclic approach to large-scale short-term planning in chemical batch production
. Journal of Scheduling 12, 595-606
Ballestin, F.; Trautmann, N. (2008):
An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
. International Journal of Production Research 46, 6231-6249
Neumann, K.; Schwindt, C.; Trautmann, N. (2005):
Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
. European Journal of Operational Research 165(2), 495-509
Mellentien, C.; Schwindt, C.; Trautmann, N. (2004):
Scheduling the factory pick-up of new cars
. OR Spectrum 26, 579-601
Schwindt, C.; Trautmann, N. (2003):
Scheduling the production of rolling ingots: Industrial context, model, and solution method
. International Transactions in Operational Research 10, 547-563
Neumann, K.; Schwindt, C.; Trautmann, N. (2002):
Advanced production scheduling for batch plants in process industries
. OR Spectrum 24, 251-279
Mellentien, C.; Trautmann, N. (2001):
Resource allocation with project management software
. OR Spektrum 23, 383-394
Schwindt, C.; Trautmann, N. (2000):
Batch scheduling in process industries: An application of resource-constrained project scheduling
. OR Spektrum 22, 501-524
Peer-reviewed conference proceedings
Peer-reviewed conference proceedings
Klein, N.; Trautmann, N. (2023):
Planning electric vehicle charging stations under uncertainty
. In: Proceedings of the 2023 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 0612-0616
Tran, V.; Kammermann, M.; Baumann, P. (2023):
The MPFCC algorithm: A model-based approach for fair-capacitated clustering
. In: Proceedings of the 2023 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 0677-0681
Baumann, P. (2022):
FT-KMEANS: A fast algorithm for fault-tolerant facility location
. In: Proceedings of the 2022 IEEE International Conference on Industrial Engineering and Engineering Management. Kuala Lumpur, 502-506
Klein, N.; Prünte, J. (2022):
A new deep reinforcement learning algorithm for the online stochastic profitable tour problem
. In: Proceedings of the 2022 IEEE International Conference on Industrial Engineering and Engineering Management. Kuala Lumpur, 635-639
Klein, N. (2022):
A novel continuous-time mixed-integer linear programming model for the multi-mode resource-constrained project scheduling problem
. In: Proceedings of the 18th International Workshop on Project Management and Scheduling. Virtual Conference, 84-87
Baumann, P.; Hochbaum, D.S. (2022):
A k-means algorithm for clustering with soft must-link and cannot-link constraints
. In: Proceedings of the 11th International Conference on Pattern Recognition Applications and Methods. Virtual Conference, 195-202
Baumann, P.; Kammermann, M.; Elsaesser, S. (2021):
Minimizing paper waste and setup costs in offset printing
. In: Proceedings of the 2021 IEEE International Conference on Industrial Engineering and Engineering Management. Virtual Conference, 858-862
Bigler, T.; Gnägi, M.; Trautmann, N. (2021):
A novel matheuristic for the multi-site resource-constrained project scheduling problem
. In: Proceedings of the 17th International Workshop on Project Management and Scheduling. Toulouse, 62-65
Gnägi, M.; Trautmann, N. (2021):
A continuous-time model for the multi-site resource-constrained project scheduling problem
. In: Proceedings of the 17th International Workshop on Project Management and Scheduling. Toulouse, 163-166
Schöni, C.; Baumann, P.; Trautmann, N. (2020):
An order-first split second approach to a novel variant of the cardinality-constrained covering traveling salesperson problem
. In: Proceedings of the 2020 IEEE International Conference on Industrial Engineering and Engineering Management. Virtual Conference, 324-328
Baumann, P. (2020):
A binary linear programming-based k-means algorithm for clustering with must-link and cannot-link constraints
. In: Proceedings of the 2020 IEEE International Conference on Industrial Engineering and Engineering Management. Virtual Conference, 615-619
Baumann, P. (2019): A binary linear programming-based K-means approach for the capacitated centered clustering problem. In: Wang, M.; Li, J.; Tsung, F.; Yeung, A. (eds.): Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, 347-351. Recognized with
Honorable Mention Award
.
Bigler, T.; Baumann, P.; Kammermann, M. (2019): Optimizing customer assignments to direct marketing activities: A binary linear programming formulation. In: Wang, M.; Li, J.; Tsung, F.; Yeung, A. (eds.): Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, 601-605
Gnägi, M.; Trautmann, N. (2019): A continuous-time mixed-binary linear programming formulation for the multi-site resource-constrained project scheduling problem. In: Wang, M.; Li, J.; Tsung, F.; Yeung, A. (eds.): Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, 611-614
Lerch, D.; Trautmann, N. (2019): A lazy-constraints approach to resource-constrained project scheduling. In: Wang, M.; Li, J.; Tsung, F.; Yeung, A. (eds.): Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, 531-535
Baumann, P. (2018):
A matheuristic for a real-world variant of the multiple traveling salesman problem
. In: Laosirihongthong, T.; Chai, K. H.; Jiao, R.; Xie, M. (eds.): Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok, 1426 - 1430
Bigler, T.; Strub, O. (2018):
A local-branching heuristic for the best subset selection problem in linear regression
. In: Laosirihongthong, T.; Chai, K. H.; Jiao, R.; Xie, M. (eds.): Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok, 511 - 515
Gnägi, M.; Rihm, T.; Trautmann, N. (2018):
A continuous-time MILP formulation for the multi-mode resource-constrained project scheduling problem
. In: Laosirihongthong, T.; Chai, K. H.; Jiao, R.; Xie, M. (eds.): Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok, 452-456
Gnägi, M.; Zimmermann, A.; Trautmann, N. (2018):
A continuous-time unit-based MILP formulation for the resource-constrained project scheduling problem
. In: Laosirihongthong, T.; Chai, K. H.; Jiao, R.; Xie, M. (eds.): Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok, 432 - 436
Trautmann, N.; Rihm T.; Saner, N.; Zimmermann, A. (2018):
A continuous-time assignment-based MILP formulation for the resource-constrained project scheduling problem
. In: Caramia, M.; Bianco, L.; Giordani, S. (eds.): Proceedings of the 16th International Conference on Project Management and Scheduling. Rome, 242-245
Strub, O. (2017):
A new MILP formulation for rebalancing enhanced index-tracking portfolios
. In: De Meyer, A.; Chai, K.H.; Jiao, R.; Chen, N.; Xie, M. (eds.): Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 989-993
Rihm, T.; Trautmann, N. (2017):
An assignment-based continuous-time MILP model for the resource-constrained project scheduling problem
. In: De Meyer, A.; Chai, K.H.; Jiao, R.; Chen, N.; Xie, M. (eds.): Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 35-39
Gnägi, M.; Baumann, P. (2017):
Large-scale clustering using mathematical programming
. In: De Meyer, A.; Chai, K.H.; Jiao, R.; Chen, N.; Xie, M. (eds.): Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 789-793
Baumann, P. (2017):
Optimal staff assignment and routing in personalized home care
. In: De Meyer, A.; Chai, K.H.; Jiao, R.; Chen, N.; Xie, M. (eds.): Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 1027-1031
Baumann, P.; Hochbaum, D.S.; Spaen Q. (2017):
High-performance geometric algorithms for sparse computation in big data analytics
. In: Nie , J.-Y.; Obradovic, Z.; Suzumura, T.; Ghosh, R.; Nambiar, R.; Wang, C.; Zang, H.; Baeza-Yates, R.; Hu, X.; Kepner, J.; Cuzzocrea, A.; Tang, J.; Toyoda, M. (eds): Proceedings of the 2017 IEEE International Conference on Big Data. Boston, 564-555
Rihm, T.; Trautmann, N. (2017): An assignment- and sequencing-based mixed-integer linear programming formulation for the resource-constrained project scheduling problem. In: Kaihara, T.; Nonobe, K. (eds.): Proceedings of the International Symposium on Scheduling 2017. Nagoya, 39–44
Rihm, T. (2017): Minimizing operational costs of assessment centers. In: Kaihara, T.; Nonobe, K. (eds.): Proceedings of the International Symposium on Scheduling 2017. Nagoya, 45–50
Strub, O.; Trautmann, N. (2017):
A genetic algorithm for the UCITS-constrained index-tracking problem
. In: Lozano, J. (eds.): Proceedings of the 2017 IEEE Congress on Evolutionary Computation. San Sebastián, 822-829
Trautmann, N.; Gnägi, M. (2016):
An implementation of the parallel schedule-generation scheme for applying Microsoft Excel’s evolutionary solver to the resource-constrained project scheduling problem RCPSP
. In: Suryadi, K.; Hartono, B.; Ari Samadhi, T.M.A.; Chen, N.; Xie, M. (eds.): Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management. Bali, 35-39
Correa Shokiche, C. et al. (2016):
High-throughput glomeruli analysis of µCT kidney images using tree priors and scalable sparse computation
. In: NN (eds): Proceedings of the 19th International Conference on Medical Image Computing and Computer Assisted Intervention. Athens, 370-378
Zimmermann, A. (2016):
An MIP-based heuristic for scheduling projects with work-content constraints
. In: Suryadi, K.; Hartono, B.; Ari Samadhi, T.M.A.; Chen, N.; Xie, M. (eds.): Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management. Bali, 1195-1199
Strub, O.; Trautmann, N. (2016):
An application of Microsoft Excel’s evolutionary solver based on a novel chromosome encoding scheme to the 1/N portfolio tracking problem
. In: Suryadi, K.; Hartono, B.; Ari Samadhi, T.M.A.; Chen, N.; Xie, M. (eds.): Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management. Bali, 745-749
Baumann, P. (2016):
Sparse-reduced computation for large-scale spectral clustering
. In: Suryadi, K.; Hartono, B.; Ari Samadhi, T.M.A.; Chen, N.; Xie, M. (eds.): Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management. Bali, 1284-1288
Gnägi, M.; Trautmann, N. (2016): Microsoft Excel’s evolutionary solver and the resource-constrained project scheduling problem RCPSP: Solution approach and performance analysis. In: Ruiz, R., Alvarez-Valdes, R. (eds.): Proceedings of the 15th International Conference on Project Management and Scheduling. Valencia, 17-20
Rihm, T.; Trautmann, N. (2016): A decomposition heuristic for an assessment center planning problem. In: Ruiz, R., Alvarez-Valdes, R. (eds.): Proceedings of the 15th International Conference on Project Management and Scheduling. Valencia, 206-209
Baumann, P.; Hochbaum, D.S.; Spaen Q. (2016):
Sparse-reduced computation: enabling mining of massively-large data sets
. In: De Marsico, M., Sanniti di Baja, G., Fred, A. (eds.): Proceedings of the 5th International Conference on Pattern Recognition Applications and Methods. Rome, 224-231
Strub, O.; Trautmann, N. (2016):
An iterated greedy heuristic for the 1/N portfolio tracking problem
. In: Vitoriano, B., Parlier, G.H., de Werra, D. (eds.): Proceedings of the 5th International Conference on Operations Research and Enterprise Systems. Rome, 424-431
Strub, O.; Baumann, P. (2015):
Index tracking using data-mining techniques and mixed-binary linear programming
. In: Magnanti, T., Chai, K., Jiao, R., Chen, S., Xie, M. (eds.): Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 1208-1212
Baumann, P.; Cooper, R.J.; Hochbaum, D.S.; Patel, N.; Shalia, K. (2015):
Efficient deployment of mobile detectors for security applications
. In: Magnanti, T., Chai, K., Jiao, R., Chen, S., Xie, M. (eds.): Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 214-218
Rihm, T.; Baumann, P. (2015):
Improving fairness in staff assignment: An approach for lexicographic goal programming
. In: Magnanti, T., Chai, K., Jiao, R., Chen, S., Xie, M. (eds.): Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 1247-1251. Recognized with
Honorable Mention Award
.
Trautmann, N.; Gnägi, M. (2015):
On an application of Microsoft Excel’s evolutionary solver to the resource-constrained project scheduling problem RCPSP
. In: Magnanti, T., Chai, K., Jiao, R., Chen, S., Xie, M. (eds.): Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 646-650
Rihm, T.; Baumann, P. (2015): A lexicographic goal programming approach for staff assignment with acceptance levels. In: Hanz álek, Z., Kendall, G., McCollum, B., Š ůcha, P. (eds.): Proceedings of the 7th Multidisciplinary International Conference on Scheduling: Theory and Applications. Prague, 526-540
Zimmermann, A.; Trautmann, N. (2015): A list-scheduling approach for the planning of assessment centers. In: Hanzálek, Z., Kendall, G., McCollum, B., Šůcha, P. (eds.): Proceedings of the 7th Multidisciplinary International Conference on Scheduling: Theory and Applications. Prague, 541-554
Baumann, P.; Hochbaum, D.S (2014):
Sparse computation for large-scale data mining
. In: Lin, J. et al. (eds.): Proceedings of the 2014 IEEE International Conference on Big Data. Washingtion DC, 354-363
Baumann, P.; Trautmann, N. (2014):
Efficient symmetry-breaking formulations for grouping customer orders in a printing shop
. In: Ahmed, P., Jiao, R., Teh, PL., Xie, M. (eds.): Proceedings of the 2014 IEEE International Conference on Industrial Engineering and Engineering Management. Malaysia, 506-510
Grüter, J.; Trautmann, N.; Zimmermann, A. (2014):
An MBLP model for scheduling assessment centers
. In: Huisman, D.; Louwerse, I.; Wagelmans, A. (eds.): Operations Research Proceedings 2013. Springer, Berlin, 161-167
Rihm, T.; Trautmann, N. (2014):
A MIP-based decomposition heuristic for resource-constrained project scheduling
. In: Fliedner, T., Kolisch, R., Naber, A. (eds.): Proceedings of the 14th International Conference on Project Management and Scheduling. München, 193-196
Baumann, P.; Trautmann N. (2014): An MILP formulation for scheduling of work-content-constrained projects. In: Fliedner, T., Kolisch, R., Naber, A. (eds.): Proceedings of the 14th International Conference on Project Management and Scheduling. München, 24-27
Zimmermann, A.; Trautmann N. (2014):
Scheduling of assessment centers: an application of resource-constrained project scheduling
. In: Fliedner, T., Kolisch, R., Naber, A. (eds.): Proceedings of the 14th International Conference on Project Management and Scheduling. München, 263-266. Ausgezeichnet mit Best Student Paper Award
Baumann, P.; Trautmann, N. (2013):
Optimal scheduling of work-content-constrained projects
. In: Laosirihongthong, T.; Jiao, R.; Xie, M.; Sirovetnukul, R. (eds.): Proceedings of the 2013 IEEE International Conference on Industrial Engineering and Engineering Management.
Baumann, P.; Trautmann, N. (2012):
Operations scheduling in make-and-pack production: schedule construction and GA-based priority-rule generation procedures
. In: Kwong, S., Ng S., Jiao R., Xie M. (eds.): Proceedings of the 2012 IEEE International Conference on Industrial Engineering and Engineering Management. Hong Kong, 454-458
Baumann, P.; Trautmann, N. (2012): A hybrid approach to large-scale short-term scheduling in make-and-pack production. In: NN(eds.): Proceedings of the 4th International Conference on Information Systems, Logistics and Supply Chain. Québec
Brandinu, G.; Trautmann, N. (2012): An integer-programming approach to benefit-maximal selection and scheduling of resource-constrained projects. In: Kwong, S., Ng S., Jiao R., Xie M. (eds.): Proceedings of the 2012 IEEE International Conference on Industrial Engineering and Engineering Management. Hong Kong, 807-811
Brandinu, G.; Trautmann, N. (2012): Sequential selection and heuristic scheduling of multiple resource-constrained projects. In: 13th International Conference on Project Management and Scheduling. Leuven, 102-105
Baumann, P.; Trautmann, N. (2011):
Heuristic decomposition and LP-based scheduling in make-and-pack production
. In: Ng S., Jiao R., Xie M. (eds.): Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 362-366
Trautmann, N.; Brandinu, G. (2011):
A serial scheme for minimizing the duration of resource-constrained projects within Microsoft Project
. In: Ng S., Jiao R., Xie M. (eds.): Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 893-897
Trautmann, N.; Brandinu, G. (2011): Scheduling in service systems: an application in the event-tourism industry. In: Dessouky, M.; Dessouky, M. (Eds.): Proceedings of the 41th International Conference on Computers and Industrial Engineering. Los Angeles, 866-871
Baumann, P.; Trautmann, N. (2011): Minimizing changeover times of a make-and-pack production process: model and case study. In: Fowler, J.; Kendall, G.; McCollum, B. (Eds.): Proceedings of the 5th Multidisciplinary International Conference on Scheduling: Theory and Application. Phoenix, 539-541
Brandinu, G.; Trautmann, N. (2011): An MILP-approach to the optimization of event-bus schedules: a scheduling application in the tourism sector. In: Fowler, J.; Kendall, G.; McCollum, B. (Eds.): Proceedings of the 5th Multidisciplinary International Conference on Scheduling: Theory and Application. Phoenix, 137-145
Trautmann, N.; Baumann, P.; Saner, N.; Schäfer, T. (2011): Decomposition approaches for multi-stage multi-product batch-production scheduling: a refined batching model. In: Fowler, J.; Kendall, G.; McCollum, B. (Eds.): Proceedings of the 5th Multidisciplinary International Conference on Scheduling: Theory and Application. Phoenix, 596-598
Baumann, P.; Trautmann, N. (2011): A continuous-time MILP to compute schedules with minimum changeover times for a make-and-pack production. In: Pistikopoulos, E.; Georgiadis, M.; Kokossis, A. (Eds.): 21st European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 1060-1064
Trautmann, N.; Baumann, P.; Saner, N.; Schäfer, T. (2011): Batch sizing in multi-stage, multi-product batch production systems. In: Pistikopoulos, E.; Georgiadis, M.; Kokossis, A. (Eds.): 21st European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 905-909
Trautmann, N.; Baumann, P. (2010):
An iterative backward/forward technique for the scheduling of resource-constrained projects within Microsoft Project
. In: Lian, Z., Wu, Z., Xie, M., Jiao, R. (eds.): Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, 1558-1562
Baumann, P.; Trautmann, N. (2010):
An MILP approach to short-term scheduling of an industrial make-and-pack production facility with batch splitting and quality release times
. In: Lian, Z., Wu, Z., Xie, M., Jiao, R. (eds.): Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, 1230-1234. Recognized with
Honorable Mention Award
.
Trautmann, N.; Baumann, P. (2010):
A bidirectional schedule-improvement procedure for Microsoft Project
. In: Kacem, I. (Ed.): Proceedings of the 40th International Conference on Computers and Industrial Engineering. Awaji, 1-5.
Baumann, P.; Trautmann, N.; Zimmermann, A. (2010): An implementation of the iterative forward/backward scheduling technique in Microsoft Project. In: 12th International Conference on Project Management and Scheduling. Tours, 81-84
Trautmann, N.; Baumann, P. (2009):
Resource-constrained scheduling of a real project from the construction industry: a comparison of software packages for project management
. In: Sun, H., Jiao, R., Xie, M. (Eds.): Proceedings of the 2009 IEEE International Conference on Industrial Engineering and Engineering Management. Hong Kong, 628-632
Trautmann, N.; Baumann, P. (2009):
Resource-allocation capabilities of commercial project management software: an experimental analysis
. In: Kacem, I. (Ed.): Proceedings of the 39th International Conference on Computers and Industrial Engineering. Troyes, 1155–1160
Trautmann, N.; Baumann, P. (2009): Project scheduling with precedence constraints and scarce resources: an experimental analysis of commercial project management software. In: Fleischmann, B.; Borgwart, K.; Klein, R.; Tuma, A. (Eds.): Operations Research Proceedings 2008. Springer, Berlin, 165-170
Trautmann, N.; Fink, R.; Sagebiel, H.; Schwindt, C. (2008): A decomposition approach to short-term scheduling of multi-purpose batch processes. In: Braunschweig, B.; Joulia, X. (Eds.): 18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 157-162
Trautmann, N.; Fink, R.; Sagebiel, H.; Schwindt, C. (2007):
A MIP/RCPSP decomposition approach to short-term planning in chemical batch production with non-identical parallel processing units
. In: Helander, M., Xie, M., Jiao, R., Tan, K.C. (Eds.): Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 1342-1346. Nominiert für best paper award
Schwindt, C.; Fink, R.; Trautmann, N. (2007):
A priority-rule based method for scheduling in chemical batch production
. In: Helander, M., Xie, M., Jiao, R., Tan K.C. (Eds.): Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore, 1347-1351
Trautmann, N.; Schwindt, C. (2007): Large-scale short-term planning in chemical batch production. In: Baptiste, P., Kendall, G., Munier-Kordon, A., Sourd, F. (Eds.): Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Applications. Paris, 490-497
Trautmann, N.; Fündeling, C.-U. (2007): Supply chain management and advanced planning in the process industries. In: Waldmann, K.-H., Stocker, U.M. (Eds.): Operations Research Proceedings 2006. Springer, Berlin, 503-508
Fündeling, C.-U.; Trautmann, N. (2007): Belegungsplanung einer Make&Pack-Anlage mit kontinuierlicher Prozessführung: Eine Fallstudie. In: Günther, H.-O.; Mattfeld, D.; Suhl, L. (Eds.): Management logistischer Netzwerke. Springer, Berlin, 301-320
Fündeling, C.-U.; Trautmann, N. (2006): Scheduling of make and pack plants: a case study. In: Marquardt, W.; Pantelides, C. (Eds.): 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 1551-1556
Schwindt, C.; Herrmann, S.; Trautmann, N. (2006): Planning and scheduling of multipurpose continuous plants. In: Marquardt, W.; Pantelides, C. (Eds.): 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2159-2164
Trautmann, N.; Schwindt, C. (2006): Priority-rule based scheduling of chemical batch processes. In: Marquardt, W.; Pantelides, C. (Eds.): 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2165-2170
Schwindt, C.; Herrmann, S.; Trautmann, N. (2006): A heuristic decomposition method for the short-term planning of continuous plants. In: Tenth International Workshop on Project Management and Scheduling. Poznan, 313-318
Ballestin, F.; Trautmann, N. (2006): A metaheuristic approach for the resource-constrained weighted earliness-tardiness project scheduling problem. In: Tenth International Workshop on Project Management and Scheduling. Poznan, 56-62
Trautmann, N.; Schwindt, C. (2006): A heuristic method for large-scale batch scheduling in the process industries. In: Haasis, H.-D.; Kopfer, H.; Schönberger, J. (Eds.): Operations Research Proceedings 2005. Springer, Berlin, 155-160
Fündeling, C.-U.; Trautmann, N. (2005): Belegungsplanung einer Make&Pack-Anlage: eine Fallstudie aus der Konsumgüterindustrie. In: Günther, H.-O.; Mattfeld, D.; Suhl, L. (Eds.): Supply Chain Management und Logistik. Physica, Heidelberg, 223-233
Trautmann, N.; Schwindt, C. (2005): A MINLP/RCPSP decomposition approach for the short-term planning of batch production. In: Puigjaner, L.; Espuña, A. (Eds.): European Symposium on Computer Aided Process Engineering - 15. Elsevier, Amsterdam, 1309-1314
Schwindt, C.; Trautmann, N. (2004): A priority-rule based method for batch production scheduling in the process industries. In: Ahr, D.; Fahrion, R.; Oswald, M.; Reinelt, G. (Eds.): Operations Research Proceedings 2003. Springer, Berlin, 111-118
Trautmann, N. (2004): A two-stage approach for batch production scheduling in the process industries. In: The 9th International Workshop on Project Management and Scheduling. Nancy / France, April 26-28, 291-294
Schwindt, C.; Trautmann, N. (2003): Scheduling of rolling ingots production. In: Leopold-Wildburger, U.; Rendl, F.; Wäscher, G. (Eds.): Operations Research Proceedings 2002. Springer, Berlin, 83-88
Trautmann, N. (2003): Project scheduling with changeover times - schedule feasibility and network flows. In: Proceedings of the International Conference on Industrial Engineering and Production Management, Vol. 1. Porto / Portugal, May 26-28, 37-43
Schwindt, C.; Trautmann, N. (2002): Scheduling continuous material flows. In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future. Porto / Portugal, July 3-5, 757-764
Schwindt, C.; Trautmann, N. (2002): Storage problems in batch scheduling. In: Chamoni, P.; Leisten, R.; Martin, A.; Minnemann, J.; Stadtler, H. (Eds.): Operations Research Proceedings 2001. Springer, Berlin, 213-217
Trautmann, N. (2002): Anlagenbelegungsplanung in der Prozeßindustrie. In: Chamoni, P.; Leisten, R.; Martin, A.; Minnemann, J.; Stadtler, H. (Eds.): Operations Research Proceedings 2001. Springer, Berlin, 483-490
Trautmann, N. (2002): Internet-based exercises and mini-exams for production and operations management. In: Chamoni, P.; Leisten, R.; Martin, A.; Minnemann, J.; Stadtler, H. (Eds.): Operations Research Proceedings 2001. Springer, Berlin, 465-469
Trautmann, N. (2002): Storage problems in process industries. In: The 8th international workshop on project management and scheduling PMS. Valencia / Spain, April 2-5, 359-363
Trautmann, N.; Schwindt, C. (2002): Storage problems in process scheduling. In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future. Porto / Portugal, July 3-5, 749-756
Trautmann, N. (2001): Batch scheduling in process industries: Solution Procedures. In: Proceedings of the 17th International Conference on CAD/CAM, Robotics and Factories of the Future. Durban / South Africa, July 8-12, 638-645
Trautmann, N. (2001): Calendars in project scheduling. In: Fleischmann, B.; Lasch, R.; Derigs, U.; Domschke, W.; Rieder, U. (Eds.): Operations Research Proceedings 2000. Springer, Berlin, 388-392
Trautmann, N. (2001): Components of advanced planning systems for process industries. In: Proceedings of the International Conference on Industrial Engineering and Production Management. Québec City, August 20-23, 253-262
Trautmann, N. (2000): Batch scheduling in process industries - an application of resource-constrained project scheduling. In: The 7th International Workshop on Project Management and Scheduling. University of Osnabrueck, 275-277
Trautmann, N. (2000): Process flow scheduling als ressourcenbeschränktes Projektplanungsproblem. In: Inderfurth, K.; Schwödiauer, G.; Domschke, W.; Juhnke, F.; Kleinschmidt, P.; Wäscher, G. (Eds.): Operations Research Proceedings 1999. Springer, Berlin, 491-496
Contributions to collections
Contributions to collections
Baumann, P.; Keupp, M.M. (2020)
: Assessing the Reliability of Street Networks: A Case Study Based on the Swiss Street Network. In: Keupp, M.M. (Ed.): The Security of Critical Infrastructures: Risk, Resilience and Defense. Springer International Publishing, Cham, 111-129
Baumann, P.; Trautmann, N. (2015)
: Resource-constrained project scheduling with project management information systems. In: Schwindt, C.; Zimmermann, J. (Eds.): Handbook on Project Management and Scheduling Vol. 2. Springer International Publishing, Cham, 1385-1400
Baumann, P.; Fündeling, C.-U.; Trautmann, N. (2015)
: The resource-constrained project scheduling problem with work-content constraints. In: Schwindt, C.; Zimmermann, J. (Eds.): Handbook on Project Management and Scheduling Vol. 1. Springer International Publishing, Cham, 533-544
Schwindt, C.; Trautmann, N. (2008):
Rolling ingots production scheduling. In: Artigues, C.; Demassey, S.; Néron, E. (Eds.): Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications. ISTE, London, 257-266
Schwindt, C.; Trautmann, N. (2006):
A cyclic approach to large-scale short-term planning of multipurpose batch plants. In: Morlock, M.; Schwindt, C.; Trautmann, N.; Zimmermann, J. (Eds.): Perspectives on Operations Research. Deutscher Universitäts-Verlag, Wiesbaden, 225-237
Gentner, K.; Neumann, K.; Schwindt, C.; Trautmann, N. (2004):
Batch production scheduling in the process industries. In: Leung, J.Y.T. (Ed.): Handbook of Scheduling: Algorithms, Models, and Performance Analysis. CRC Press, Boca Raton, 48/1-48/21
Neumann, K.; Schwindt, C.; Trautmann, N. (2001):
Short-term planning of batch plants in process industries. In: Kischka, P.; Leopold-Wildburger, U.; Möhring, R.H.; Radermacher, F.-J. (Eds.): Models, Methods and Decision Support in Management. Physica, Heidelberg, 211-226
Books
Books
Morlock, M.; Schwindt, C.; Trautmann, N.; Zimmermann, J. (2006):
Perspectives on Operations Research. Deutscher Universitäts-Verlag, Wiesbaden
Trautmann, N. (2005):
Operative Planung der Chargenproduktion. Deutscher Universitäts-Verlag, Wiesbaden (zgl. Habilitationsschrift, Universität Karlsruhe)
Trautmann, N. (2001):
Anlagenbelegungsplanung in der Prozessindustrie. Deutscher Universitäts-Verlag, Wiesbaden (zgl. Dissertation, Universität Karlsruhe).
A
usgezeichnet mit dem Dissertationspreis 2001 der Gesellschaft für Operations Research GOR
Further publications
Further publications
Schwindt, C.; Trautmann, N.; Fink, R. (2008):
Hierarchische Anlagenbelegungsplanung bei Chargenproduktion. PPS Management 13, 35-38
Trautmann, N.; Schwindt, C. (2006):
Method of Plant Occupancy Planning in the Process Industry. US Patent No. 7062448
Mellentien, C.; Trautmann, N.; Wiegand, D. (2002):
Methoden gegen das Chaos: Projektmanagement-Software im Vergleich. c't Magazin für Computertechnik, 194-201
Schwindt, C.; Trautmann, N. (2002):
Operations Research im Supply-Chain-Management. Karlsruher Transfer 28, 29-31
You are here
Group for Business Analytics, Operations Research and Quantitative Methods
Research
Publications
Top